topleft
topright

Sea Ice Outlook

See the latest September sea ice outlook:  July report

Tiksi Update

Scientists and engineers from NOAA and AARI have arrived in Tiksi to install critical measurement systems.  Click on the Tiksi tab to see the latest update (6/1/10).

VAUUAV

UAVs over Greenland and Svalbard:  Variability of Albedo Using an Unmanned Aerial Vehicle (VAUUAV).  Learn more about a current field program designed to measure the surface reflectivity of cryospheric surfaces.

IASOA Email List

If you are interested in receiving emails about IASOA events, please contact Lisa Darby (lisa.darby@noaa.gov).

We're on Facebook!

Can we help you?

Did you find what you needed? If not, click here to contact IASOA.
IASOA logo
International Polar Year
Tiksi Update PDF Print E-mail

 

 

 

Roshydromet, NOAA, FMI and Polar Foundation, Tiksi Project Updates

 

October 1, 2009

 

 

 

PROJECTS INSTALLATION REPORT - September 2009

 

(1)    U.S. Radiation Sensors for the Baseline Surface Radiation Network Program (in transit)

(2)    U.S. Climate Reference Network Site (in transit)

(3)    Black Carbon Sampling (training completed and program operating)

(4)    U.S. Surface Ozone Sampling (in transit)

(5)    U.S. Surface Heat and Energy Balance Fluxes (in transit)

(6)    Finnish Carbon Dioxide and Methane concentrations (operating)

(7)    Finnish Carbon Dioxide and Methane Fluxes (partially installed, not operating)

(8)    U.S. Green House Gas Sampler (training completed and program operating)

(9)    Finnish Aerosol Size Distribution Monitoring (operating and awaiting additional modifications and infrastructure support)

(10)  Aerosol Filter Sampling

(11)  Russian Radiation Sensors (installed)

(12)  Russian meteorological instrumentation (scheduled for winter deployment)

(13)  Russian Total Ozone Measurements (installed)

(14)  Russian Permafrost Measurements (installed)

(15)  Precipitation chemistry (installed)

(16)  Russian UV measurements (installed)

 

SHIPPING

All Russian and Finnish equipment was on site at start of deployment period

U.S. Shipment was significantly delayed and expected to arrive after U.S. team departs Tiksi

 

CUSTOMS

FMI Equipment cleared customs and has been delivered

NOAA customs paperwork in progress with support from Roshydromet-Yakutsk

 

DATES OF INSTALLATION IN TIKSI COMPLETED

All science teams will have departed Tiksi by October 1

There was no overlap with construction team

 

INFRASTRUCTURE SUPPORT

The contract between CH2MHill and the Polar Foundation was signed in early September.

Representatives of Roshydromet Yakutsk met with members of the Russian and U.S. science teams at the Yakutsk Airport on September 21.

A representative of the Polar Foundation met with the Science teams at the Tiksi site on September 23rd

The local Tiksi Roshydromet office provided significant infrastructure support.

The construction crew contracted to the Polar Foundation foreman and crew are scheduled to arrive in Tiksi on October 2.  Extensive project requests have been developed.

Data communications have been established between the Tiksi Observatory and AARI in St Petersburg.

An AARI IT system manager deployed a video conferencing system.

A computer system has been installed at the CAF attached to security cameras; there is a wireless transmission of security camera data to the weather station.

The weather station has good internet connectivity.

 

BECAUSE THERE WAS NO OVERLAP BETWEEN SCIENCE TEAMS AND CONSTRUCTION TEAMS, SIGNIFICANT TIME WAS SPENT ON INSPECTIONS AND DEVELOPMENT OF DETAILED REQUESTS FOR INFRASTRUCTURE IMPROVEMENTS.

 

REPORT ON ROADS AND POWER

A new insulated power line has been installed from the town of Tiksi to the weather station (and CAF) and the road has been considerably improved. 

 

newpowerandcaf 

 

New power line and Clean Air Facility (T. Uttal) 

 

REPORT ON WEATHER STATION

The weather station is largely completed and occupied by the Roshydromet Tiksi weather station staff.  Internet communications are available.  There are two furnished bedrooms, a kitchen and good office space and accessible roof space where some science projects are presently being installed; it already supports some weather station instruments.  A list of final items for completion has been submitted, including plumbing and water, additional insulation, drainage, additional weatherization, and noise abatement issues during high wind periods. The weather station is spacious, comfortable and furnished.  There is storage, and adequate additional space inside as well as on the roof for science projects without interference with the routine weather station activities. Power has been uninterrupted during this visit, although some UPS activity indicates that there may be ongoing power fluctuations.  The diesel generator is not yet hooked into the power system.

 

wxstationinterior

 

The new weather station is now occupied by the Roshydromet Tiksi weather station staff (T. Uttal).

 

REPORT ON CLEAN AIR FACILITY

The CAF building has been constructed on the foundation and has some electrical outlets.  The interior finish work is in progress.  The science team has confirmed the location of outside towers and racks and connecting walkways and power/communication lines.  The UPS was installed by Roshydromet and NOAA science teams. 

 

cafinterior

 

Interior of the Clean Air Facility (T. Uttal).

 

OPERATIONS

Roshydromet has received official approval for measurements that will be made by the initial 15 projects.

The Roshydromet Tiksi Office has interviewed the science teams on the technical, logistical and personnel requirements for each project and is developing plan for support.   Programs of Operation have been submitted to the Tiksi Roshydromet Office.

 

The Roshydromet Tiksi Office has assigned a central point of contact and procedure for communications on technical issues relating to the new Observatory measurements.

 

Training was provided to Tiksi Observatory staff on U.S, Finnish and Russian projects. 

 

Tiksi Roshydromet has hired an engineering support technician who will have a primary assignment of operating observatory equipment.

 

MEETINGS IN YAKUTSK AND MOSCOW

The Russian and US Science teams and the Tiksi Station Director will meet with Roshydromet -Yaktusk Representatives to discuss contracts, operations (including further training), oversight of the construction and customs of the US equipment.

 

The Russian, US and Finnish science team is scheduled visit the U.S. Embassy and with Roshydromet in Moscow on October 5 and 6 to provide a trip report and develop a schedule of activities for the following months. Representatives of the science teams will be:

 

Alexander Makshtas

Alexander Reshetnikov

Alexi Konoplev

Taneil Uttal

Alexander Kuzmichov

Robert Albee

Ludmila Matrosova

 

 

PERSONNEL THAT WERE ON SITE IN TIKSI

AARI

Alexander Makshtas

Vasily Kustov

Alexander Kuzmichov

 

MGO

Alexander Reshetnikov

Victor Ivakhov

 

NOAA

Taneil Uttal

Ludmila Matrosova

Robert Albee

Brian Vasel

 

FMI

Tuomas Laurila

Mika Aurela

Eija Asmi

Irina Loutsenko

 

 
< Prev
Joomla Template by Joomlashack
Joomla Templates by JoomlaShack Joomla Templates
adobe cs2 indesign tutorial Buy Adobe Acrobat 8.0 Professional for Mac Osx at cheap price online adobe indesign trainingadobe illustrator 11 trial Buy Nuance OmniPage PRO v16 at cheap price adobe 2bcs3adobe illistrator Buy AutoDesk Inventor Series v11 at cheap price microsoft office 2007 free keyadobe after effects trial download Buy AutoDesk Architectural Desktop 2007 at cheap price adobe flash player 9 install safelyadobe photoshop vista windows Buy AutoDesk AutoCAD Architecture 2008 at cheap price microsoft windows mobile applicationsmake confetti adobe illustrator tutorial Buy Quark QuarkXPress 7.3 Passport Mac OsX at cheap price download os x adobe fireworks cs3microsoft office 2007 ultimate student teacher Buy Apple Mac OSx Leopard v10.5 at cheap price classic adobe readerpurchase adobe acrobat 7 Buy Solidworks Solidworks v2008 at cheap price free program similar to adobe elementsmicrosoft office infopath virtual press kit Buy Corel Coreldraw Graphics Suite X4 at cheap price microsoft windows installer 3.0 downloadadobe photoshop supported formats Buy Macromedia Studio MX 2004 at cheap price r blank adobe flash certifiedadobe indesign cs2 download Buy Microsoft Office VX for Mac OsX at cheap price microsoft office xmlaccess print adobe Buy Adobe Acrobat 9.0 Pro Extended at cheap price clone adobe 2.0adobe photoshop image ready 7.0 Buy Microsoft Office 2004 for Mac OsX at cheap price view enable pictures adobe photoshop 3.0adobe free acrobat reader Buy Adobe InDesign CS3 Mac Osx at cheap price adobe free flash playeradobe full software downl Buy Solidworks SolidWorks v2006 at cheap price microsoft windows vista car phonemicrosoft windows net Buy Microsoft Office Project Pro 2007 at cheap price microsoft windows service pack 4